Jim Poole Home Projects LLC

Jim Poole Home Projects LLC Home Remodeling - Bathrooms - Decks - Doors - Windows - Floors - Structures

This was a complete bathroom remodel. Fiberglass neo-angle unit was removed, existing tile and all components and fixtur...
01/20/2026

This was a complete bathroom remodel. Fiberglass neo-angle unit was removed, existing tile and all components and fixtures. An electric heat mat was installed on the concrete floor and floor leveler used over. The shower pan was a build-up using sand mix and an Everbuilt curb was used, tiled on both sides and topped with Lowe's Satori composite marble in soft grey, the floor grout was matched to that color. Nero black 8x8 hexagon tiles and 2x2 black hexagon shower pan mosaic tile were from Wayfair. White 8x24 subway tile set vertical with a 1/3 stagger layout was from Lowe's. A charcoal Mapie grout was used. Glass encloser in chrome from Amazon. Schluter kerdi membrane on walls and pan. Schluter chrome tile edging was used on wall tile edges. The vanty was procured from Wayfair and is a mossy.green color with 2 drawers and a white marble top. A GFI outlet was intalled for a Toto bidet seat. Two glass shower shelves from Amazon. Delta chrome widespread faucet. Delta Raincan diverter shower handle set and valve. Black tile on curb face from Floor & Decor.

11/22/2025

Panted the walls in this entire basement last week. One bedroom ceiling and bathroom ceiling as well. Several hours of filling holes. dusting, vacuuming, and wiping down baseboards first; a dusty mess of cobwebs as it has not been lived in or used for some time. Took 5 gallons and one quart of the yellow bathroom paint. Four visits- 23.5 hours total. Clients cleaning up to put on market.

Solid color stain on our previously built carport. Brush cut-in then sprayed and back-brushed. The home will be match co...
11/08/2025

Solid color stain on our previously built carport. Brush cut-in then sprayed and back-brushed. The home will be match color painted soon.
Also installed a new front door that will be painted.

Installed this SS work station style kitchen sink, complete with cutting board, colander, dish drying rack, sink floor g...
09/26/2025

Installed this SS work station style kitchen sink, complete with cutting board, colander, dish drying rack, sink floor grate, and a pop-up drain with a removable strainer for catching food waste.
Cut out and removed the stained Corian double sink; a nerve-wracking process. Because of the new sink's offset drain I was able to remove the old non-code 1.25" S trap and install a 1.5" p trap to sanitary T with an air admittance valve, 4 inches above horizontal part of drain, to enhance draining. Set rim of new sink on 100% clear silicon and weighted it to counter overnight.

09/24/2025

RIP to Lisa Lombardi who passed away earlier this week. Lisa worked with me for years at Amingo Glass Ltd. And some of you may remember Lisa for her house-sitting and dog-walking in the neighborhood. Lisa's husband, Rick, passed away earlier this year. A fun, quirky, and lovable couple they will be missed.

Spray painted this railing flat black, and basement entry retaining walls with siding color matched exterior paint. Much...
09/15/2025

Spray painted this railing flat black, and basement entry retaining walls with siding color matched exterior paint. Much paper and tape were used. The breeze was no help.

On this bathroom remodel we removed an whirlpool bath style deck style tub to install a smaller less water- more practic...
09/06/2025

On this bathroom remodel we removed an whirlpool bath style deck style tub to install a smaller less water- more practical, soaking vessel tub. We replaced the popcorn effect ceiling drywall. Used Mapie waterproofing uncoupling membrane under the floor tile over floor leveler. We removed the closet door and jamb and replaced the four shelves with full extension pull out drawers as the closet is so deep and narrow it was difficult to reach things in the back. Two new doors with obscure glass panels let lots of light in. Installed a 5/4 clear pine window sill with a clear spar urethane finish. Farrow and Ball paint, ceiling same shade as walls with its complimentary white for the doors and trim. New vessel tub faucet, vanity faucet and mirror, new white decoratore style switches and outlets, new in-wall heater with a new thermostat. Mapie pre-mix grout on 1/3 staggered tile layout.

On this project we installed a new wall mount vanity and all new black fixtures and hardware. The plumbing was moved to ...
07/31/2025

On this project we installed a new wall mount vanity and all new black fixtures and hardware. The plumbing was moved to hide within the new vanity. The vanity light was moved up the wall also. Made a dramatic new look to the old pedestal sink and nickel fixtures. Tub faucet back ordered.

On this project we installed a window in a blank wall, patched the drywall and then painted the room and dining room adj...
07/31/2025

On this project we installed a window in a blank wall, patched the drywall and then painted the room and dining room adjacent and both ceilings and the trims. Lighted up the space and added a nice view.

On this project we constructed a porch off the back of this home. We  extendied the existing deck  by adding an 8 x 14 d...
06/03/2025

On this project we constructed a porch off the back of this home. We extendied the existing deck by adding an 8 x 14 deck off its back 28' side and building a roof using brown metal panels, this created a 14 x 16 covered space over the deck and patio sliding back doors. We removed the existing railing and installed Freedom Margate black powder coated aluminum railing from Lowes. My working partner Dan Napert welded up and powder coated the 4 black metal gusset brackets. We stained the beams to match the home, and pre stained 1x6 T&G boards to finish off the ceiling. We added a new fan/light switch and installed a damp location ceiling fan. Deck , fascia, and post staining shall be done later after "seasoning".

Progress on our deck extension- porch projects, with Dan Napert.
05/08/2025

Progress on our deck extension- porch projects, with Dan Napert.

Nice day for a good start on another porch project. With Dan Napert.
04/30/2025

Nice day for a good start on another porch project. With Dan Napert.

Address

155 Brumbaugh Lane
Hedgesville, WV
25427

Opening Hours

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5pm
Thursday 9am - 5pm
Friday 9am - 5pm
Saturday 10am - 3pm

Alerts

Be the first to know and let us send you an email when Jim Poole Home Projects LLC posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Jim Poole Home Projects LLC:

Share

Category