Ep. 11 — The Final 5%
The last 5% of a project is often more important than the first 50%. That’s where we drop into the micro details.
We walk every foot of the boardwalk. Replace any imperfect boards. Clean up corner cuts. Shave off splinters and excess wood so the finish is tight and clean.
Then we do a full cleanup. The materials were installed during construction, but we don’t leave a construction site. We leave it looking like it just came off the factory floor. Clients deserve a brand-new product when we pull off the job.
The yellow turbidity curtain is there first to contain soil from jetting and pile driving. It also catches trash and debris that can fall in the water. We clean that out at the end of every day.
If you’ve run by on a boat lately, the water is clear again and the crew is gone.
We are effectively complete with the Jupiter Lighthouse Boardwalk.
One more mini-series episode. Then the documentary.