01/02/2026
I roll into the job site at 8 PM on New Year's Day and surprise, surprise! 340 feet of PVC is sprawled out a game of pick up sticks in the snow, courtesy of the delivery driver who treated it like 5 PM on a Friday 😂
Thankfully, the general contractor had my six and relocated 10 boxes of fittings inside since I was out repairing a boiler system in a six unit rental property for one of my best clients. I MacGyavered a pipe rack using scrap wood and a pallet that was previously a permanent snow resident to keep everything elevated until I start this crazy three-story residential container home🤘🏼
Phase one: Storm water infrastructure for the third floor flat roof, 2) Third floor decks and one ginormous second floor deck!