01/27/2023
Hot tub electrical system - this job was a “project” because of the location of the main panel and the location of the hot tub subpanel. Run 130ft of 6/3 stranded non-metallic wire; built a structure using 2 4x4 and plywood for the hot tub subpanel; dug 70ft of trench; laid 70ft of 1 1/5in PVC SCH80 conduits…. Job itself came AWESOME 😎
A big thanks to my “right hand ✋🏻” … I’m proud of you brother…!!!
🇺🇸M&M Spark Inc.🇮🇹 THE ITALIAN WAY OF WORK
LOYALTY ABOVE EVERYTHING 💚🤍❤️