10/04/2018
With a pile driving load test, a reaction frame is attached to the reaction piles and spans over the top of the test pile. As the load is applied by a hydraulic jack, the reaction beam transfers the load to the test pile, putting it in compression and putting the reaction piles in tension to test the driven piles’ capabilities.