Slade Roofing

Slade Roofing We are a Malarkey-Certified residential installer. We are also HAAG-Certified, licensed, and insured.

09/01/2026

Top 3 Questions Homeowners Ask Before a Roof Replacement | Rexburg, ID

Every homeowner asks the same three questions before we tear off their roof. Here are the honest answers.

How long does a roof replacement take? With a full crew in summer, we install 35-40 squares in a 12-13 hour day. (One square = 100 sq ft; most homes run 25-40.) Anything larger goes into a second day.

What happens if it rains or snows mid-job? We work slope by slope. One section comes off, underlayment goes down, then we move to the next. Your roof is never left open to the weather.

When is the final bill due? Paid the day the shingles go on gets you our best price.

Slade Roofing is a family-run roofing company serving Idaho and Arizona. Founded in 2016 by a 20-year insurance professional, we install Malarkey impact-resistant shingles - the system built to stop claims before they happen. 500+ five-star reviews in Idaho, 400+ in Arizona, zero shingle blowoffs on record.

Roof coming off this season? Get an honest inspection: https://sladeroof.com

08/28/2026

Top 5 roofs, ranked 🏠

CEDUR synthetic cedar shake. Standing seam metal. Malarkey Windsor. Malarkey architectural. And the one most homeowners actually end up with.

Impact rating, wind rating, and how long it actually lasts β€” that's what decides the order. Watch to the end.

Which one would you put on your house? πŸ‘‡

08/25/2026

Installing a metal roof, Part 5 β€” the cleat that locks the next panels down.

Before the next set of panels goes on, a cleat gets set on top of the transition metal β€” tucked under the panel above it and over the one below. The panel folds around that cleat and locks in.

That's what holds a metal roof down in high wind, and what keeps wind-driven rain and snow from getting underneath.

Nobody ever sees it once the roof is finished. More of this install coming.

Slade Roofing

08/24/2026

Installing a metal roof, Part 4 β€” sealing the transition.

Transitions are where metal roofs start leaking. So every part of this one gets sealed: silicone under the laps, the panels tied together, and the water given nowhere to sneak in.

Nobody ever sees this once the roof is finished. It's the reason it lasts.

More of this install coming.

Slade Roofing

Malarkey Windsor. πŸ”οΈThis is the top of the line β€” a heavyweight designer shingle with the depth and shadow of real wood ...
08/24/2026

Malarkey Windsor. πŸ”οΈ

This is the top of the line β€” a heavyweight designer shingle with the depth and shadow of real wood shake, built on Malarkey's rubberized asphalt for serious impact and weather resistance. It's the shingle we'd put on our own house.

Full tear-off, new underlayment, and every valley and ridge cut clean. Look at those hip lines from 200 feet up.

Thinking about your roof before winter? Now's the window. Free estimates.

sladeroof.com

08/24/2026

Not every roof is a rectangle. 🎯

Round, steep, cut up, or just plain weird β€” if it's a roof, we've done it.

Free estimates. sladeroof.com

08/20/2026

That seam running across the ridge is called a weave. It's where a claim went sideways.

When an adjuster only approves the slopes with documented damage, you get a partial replacement. New shingles on the back. Original shingles on the front. And a line down the middle where two roofs meet.

That line is the weak point. Two ages of shingle, two underlayments, sometimes two different profiles - tied together and asked to shed water for the next twenty years.

A roofer who knows the claims process documents the entire roof before the adjuster ever sets a ladder. Slope matching. Code items. Ventilation. Flashing. In the file up front, not argued after the check clears.

The homeowner in this video paid a full deductible and still owns a 22-year-old roof on the side of the house everyone sees.

A partial approval doesn't cancel your replacement. It just moves the date and hides it from you.

08/20/2026

Part 3. Transition flashing and Z metal - the details that keep a metal roof watertight where the planes change. Most leaks don't start in the middle of a panel, they start where two surfaces meet. Here's how we handle it on the shed build.

08/19/2026

Watch a beautiful transformation from gravel to sleek malarkey shingles made of recycled tires with the highest wind and hail resistance around. We serve communities in Idaho and Arizona! Comment below for more info.

08/18/2026

Part 2. Drip edge, and the spot most metal installs get wrong.

This roof breaks from a 6/12 down to a 4/12. That break is the problem.

The shortcut is to run the panel straight down, send it a couple inches past the transition, and butt the next one against it. Looks finished from the ground. But water slows down when the pitch flattens, and up here it doesn't just slow down β€” it sits there as snow and ice for weeks. Anything that sits on a roof eventually finds a way underneath it.

The transition gets its own flashing. That's the whole fix. It isn't expensive and it isn't hard, it just takes marking it out and taking the time.

One more thing, since the camera's running: my ice and water shield ended up under the drip edge on this eave. It belongs on top. It's been baking up here all summer and it's bonded down hard, and this is a shed behind my own building β€” so I'm leaving it. On your house we'd pull it and redo it. I'd rather show you that than cut it out. πŸ”§

Part 2 of 5.

Address

Idaho Falls, ID

Opening Hours

Monday 9am - 5pm
Tuesday 9am - 5pm
Wednesday 9am - 5pm
Thursday 9am - 5pm
Friday 9am - 5pm

Alerts

Be the first to know and let us send you an email when Slade Roofing posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Slade Roofing:

Shortcuts

Share