09/02/2026
What do you do on a 100 degree day when the customer asks you to get power to where 2 new driveway post lights will be installed?…
You hand dig 90 feet of trench and lay conduit, hammer drill through the house, fish wire to the electric panel, and get it all backfilled in 8 hours.
This was after spending 2 hours installing soffit lights.
*I would have used a machine to dig but there were irrigation lines, control wires, and a spectrum drop to avoid.