02/08/2023
Almost done withe the 3 bath remodels hanging lights / fans , painting tubs and showers , kitchen countertops , and LVP flooring and can lights took us about 5 weeks but it looks Great when at the end I'll take pics of the final projects
If looking to have work done feel free to call me I can work with you and I have discounts for seniors