11/20/2023
First of two DoJ Detention facility day rooms. Project called for demolition of 1/2”-3/8” topping, prep and patch substrate, apply 1/2”-3/8” TruPC topping and deliver an industrial level polished concrete finish.
Flooring demolition, preparation, polished concrete, epoxy, urethane cement, slab sloping/leveling, moisture mitigation, concrete sealing and joint repair.
4856 Victor Street
Jacksonville, FL
32207
Be the first to know and let us send you an email when S. David Flooring posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.