10/07/2026
The answers: (1) The DECK was built with no permit — footings, posts, beams, decking, and railings all require approved plans + a contractor permit filing. (2) The DOOR OPENING cut into the exterior wall needs its OWN separate permit — even a permitted deck doesn't cover it. Rule: get the Buildings Department work permit BEFORE you build, not after the inspector shows up. From my book Navigating Home Renovations — audiobook $9.99 here: https://patrickallenauthor.com/books/navigating-home-renovations-strategies-for-success-patrick-allen/B0DWMP8QGK