ZHR Construction ZHR Construction, let us build your next home!

Beggs house is done.
05/24/2026

Beggs house is done.

Adding some Brick to an existing house, they were tired of painting.
05/15/2026

Adding some Brick to an existing house, they were tired of painting.

Start of the Glencoe house had to put a driveway in first.
05/13/2026

Start of the Glencoe house had to put a driveway in first.

70% of the house we build want wood because they’re pretty this house another Builder built three or four years ago and ...
05/09/2026

70% of the house we build want wood because they’re pretty this house another Builder built three or four years ago and the post have weight on them. Look at the bow. We went replace them with Steel. 

Finishing up the new roof on the pharmacy in Fairfax.
04/22/2026

Finishing up the new roof on the pharmacy in Fairfax.

Doing some concrete work
04/09/2026

Doing some concrete work

Giving the Fairfax pharmacy a facelift.
04/01/2026

Giving the Fairfax pharmacy a facelift.

The Cleveland house is almost done as soon as the cleaning crew finished up.
03/28/2026

The Cleveland house is almost done as soon as the cleaning crew finished up.

The Jennings add-on is just about done check out the master shower it’s BIG
03/15/2026

The Jennings add-on
is just about done check out the master shower it’s BIG

The Beggs House is  moving along.
03/15/2026

The Beggs House is moving along.

A few pictures after the painters done of the Cleveland house  
03/03/2026

A few pictures after the painters done of the Cleveland house 