10/12/2024
This basement dig was challenging to say the least. There wasn’t a lot of room to work on this tight lot. The garage was dug first down to basement elevation and then the soil was conditioned and put back in lifts. Once that was done the basement itself was excavated. 55 tandems worth of soil was removed and the rest should be enough for the backfill. Hopefully!