07/04/2025
RTE Subdivision 2025
14,947 Cubic yards moved
All material placed and constructed into a 1500’ long privacy mound.
180ft of RCP Culverts
2150’ of 24’ wide road cut to subgrade
2700ton of limestone prepped to grade.