Muscle N Stone Masonry

Muscle N Stone Masonry Custom Stone Masonry, Stone Walls, Fireplaces, Veneer, walkways and patios.

Day 2: New Hampton project I finished digging out for drain pipe installation. Boys did  foundation repair and pipe inst...
05/27/2026

Day 2: New Hampton project I finished digging out for drain pipe installation. Boys did foundation repair and pipe install. Today is filter fabric and begin wall reconstruction... MNS

Day 1: New Hampton project. Waited out the rain then demoed wall, moved brush into woods, exposed foundation.  Sotheby's...
05/25/2026

Day 1: New Hampton project. Waited out the rain then demoed wall, moved brush into woods, exposed foundation. Sotheby's guys are coming tomorrow to fix foundation, and run drainage pies that will go in back of my wall down the drive into culvert. Good first day killa stones tomorrow, fabric banking, run some base and start wallin.

Day 2 of Phase 2 at the Dow Camp… will return when more stone gets delivered.
05/19/2026

Day 2 of Phase 2 at the Dow Camp… will return when more stone gets delivered.

Day 1 of Phase 2 at the Dow Camp in Wakefield NH. Just a little project for the family to enjoy.
05/18/2026

Day 1 of Phase 2 at the Dow Camp in Wakefield NH. Just a little project for the family to enjoy.

Final Day at the 420 job for this phase… we will be back to do some more repair work on the property later in the season...
05/08/2026

Final Day at the 420 job for this phase… we will be back to do some more repair work on the property later in the season. MNS

Day 3 of phase 2 at the 420 job. One more day here and then back to the New Durham job to finish the last stretch of wal...
05/08/2026

Day 3 of phase 2 at the 420 job. One more day here and then back to the New Durham job to finish the last stretch of wall for my buddy.

Back on 420 demo last 6 feet to base take out all little stones reset base stones get read to rebuild  on Thursday.  Day...
05/05/2026

Back on 420 demo last 6 feet to base take out all little stones reset base stones get read to rebuild on Thursday. Day 1 of THE last 6 feet

420 wall repair project in Moultonboro front side compete.  I harvested  stones to bring to site to install  back side a...
04/30/2026

420 wall repair project in Moultonboro front side compete. I harvested stones to bring to site to install back side and cap.
To be continued....

Day 3 on the 420 project… beautiful day for laying stones.
04/29/2026

Day 3 on the 420 project… beautiful day for laying stones.

Today was Day 1 of this wall repair job… crushed it!
04/28/2026

Today was Day 1 of this wall repair job… crushed it!

Address

N Main Street
Laconia, NH
03246

Telephone

+16039984257

Website

Alerts

Be the first to know and let us send you an email when Muscle N Stone Masonry posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Muscle N Stone Masonry:

Share