08/26/2026 Possum Hollow cove at the mouth of the Gravois Arm.  Removed and re-installed the dock to gain access.  Thank...
08/27/2026

08/26/2026
Possum Hollow cove at the mouth of the Gravois Arm. Removed and re-installed the dock to gain access. Thank you Ms. Baker for your business.

8/24/2026 - 8/25/2026Performed this installation on the 20 MM in Osage Beach.  There was some existing rip rap here that...
08/25/2026

8/24/2026 - 8/25/2026
Performed this installation on the 20 MM in Osage Beach. There was some existing rip rap here that had deteriorated and the customer wasn’t satisfied with. We moved the dock out of the way to provide barge access, adjusted the existing rock, and put a new layer of our rock on top of the existing.
Thank you to the Millers for your business.

Great people plus quality equipment makes R&K the  #1 material haulers at the Lake.  Every stone we place on this lake c...
08/17/2026

Great people plus quality equipment makes R&K the #1 material haulers at the Lake. Every stone we place on this lake comes out of a well maintained tandem axle R&K dump truck.

Looking for a Class A CDL driver for end dump. Must be able to pass drug screenings, clean mvr, pay based on experience. Contact Russell at 573-375–2045.

08/13/2026 - 8/14/2026Thursday and Friday we performed this installation on the 24 MM in Little Kinchlow Hollow Cove.  W...
08/17/2026

08/13/2026 - 8/14/2026
Thursday and Friday we performed this installation on the 24 MM in Little Kinchlow Hollow Cove.
Waaaayy back in the back of the cove. The barge barely made it back there. Moved and re-installed the dock to gain access. The homeowner (as well as the audience of neighbors) were tickled pink watching the process AND final product. Thank you Dr. Pulcher for your business!!!

8/10/2026 - 8/12/2026Monday through Wednesday last week we performed this install on the 1mm of the North Shore.  Moved ...
08/17/2026

8/10/2026 - 8/12/2026
Monday through Wednesday last week we performed this install on the 1mm of the North Shore. Moved and re-installed the dock to gain access. We did use more rock than was quoted but the customer is very happy (along with his wife). Happy wife happy life.
Thank you to the Bartletts for your business and your patience.
Before and after photos.

08/06/2026 - 08/07/2026Finished the week in Mill Creek Cove - 4 MM of the Gravois Arm.  Storms yesterday slowed us down ...
08/07/2026

08/06/2026 - 08/07/2026

Finished the week in Mill Creek Cove - 4 MM of the Gravois Arm. Storms yesterday slowed us down but got it done today and ready for a weekend.

07/03/2026 - 07/05/2026Finished the 260’ of wall at Formula Boats.  From here they will be doing some compacting of the ...
08/06/2026

07/03/2026 - 07/05/2026

Finished the 260’ of wall at Formula Boats. From here they will be doing some compacting of the ground behind the wall and re-paving the parking area. Thank you Tyler B. and Formula for your business.

07/30/2026 - 7/31/2026Thursday and Friday we started a rip rap installation at Formula Boats of Missouri right next to t...
08/03/2026

07/30/2026 - 7/31/2026
Thursday and Friday we started a rip rap installation at Formula Boats of Missouri right next to the Glaize Bridge. 260’ of seawall and placing 275 tons. It doesn’t always work out this way but we are able to place the rock without moving these big marina docks out of the way. They have probably 1,000 feet of wall here but for this particular portion the parking area directly behind the wall was sinking. The rip rap will stop any more material from leaching under the wall (the footing is badly eroded) and they plan to re-do the parking area as soon as we finish.

07/27/2026 - 07/29/2026Monday through Wednesday we worked on this 160’ of shoreline on the 4 MM of the main channel. Rig...
07/31/2026

07/27/2026 - 07/29/2026

Monday through Wednesday we worked on this 160’ of shoreline on the 4 MM of the main channel. Right across from what I call Hawaiian Island (Isla Del Sol). Back in the 90s it was Hawaiian Island.

275 tons placed along a new stacked wall that is going up simultaneously. Very rough here and our rip rap will hold it all!!

07/24/2026  Finished the week on the 32 MM off Standing Rock Rd. 100’ of seawall and 150 tons.  As this cove lot still s...
07/24/2026

07/24/2026 Finished the week on the 32 MM off Standing Rock Rd.
100’ of seawall and 150 tons. As this cove lot still sees wave action from the main channel, the aim here was to calm the water around the dock, as well as mitigate any further erosion at the base of the wall. A new dock from Stokes Dock Company will come in next.

Address

239 Aster Road
Lake Ozark, MO
65049

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm

Telephone

+15733652751

Alerts

Be the first to know and let us send you an email when Horseshoe Bend Dock & Rip Rap Service posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Horseshoe Bend Dock & Rip Rap Service:

Shortcuts

Share

Category