09/09/2023
Prepping for slab on an ADU in Southwest Harbor, starting framing on a building to house the water storage tanks at the local school, installing cedar fence around new scaling station at the lumber mill, and prepping the floor (actually jackhammering it out) for a remodel of employee housing, also at the mill. Along with a few other side jobs. It’s been one hell of a ride this week.