02/16/2023
This project in West Chester was a combination of small tasks and medium projects.
We installed 3 racks for garden tools in the garage. Then we built a step for access to the utility sink. We also water proofed the utility area. This entailed removing the sink and plumbing, installing pvc sheets and pvc trim, then reinstalling the plumbing.
We also installed 3 grab bars for the steps.
Inside, we installed 1 shelf in each bathroom, sensor lights in the closets, 2 curtain rods, a pull down faucet in the master to allow for hair washing in the sink and also a new door handle for the garage. The handle was actually 2 handles in different finishes that we canibalized so the black matched the exterior and the brushed nickel matched the rest of the interior doors. We also keyed the lock so it matched her existing key.
Additionally, the master bedroom and bathroom both needed fresh paint. So we gave them two good coats that included some drywall repair.