Project Spotlight: Neuro Biplane Replacement
The Silva team recently completed a Neuro Biplane replacement within a 2,600 SF active clinical environment, delivering a fully rebuilt suite without disrupting surrounding medical operations.
The project included full demolition and installation of new finishes, structural supports, CAC mechanical units, upgraded medical gas, a new scrub sink, sprinkler modifications, lighting, power/data, equipment conduit, and a new electrical panel fed from the 3rd to the 7th floor.
Working beside active MRI and IR procedure rooms, our team coordinated off‑hours work in sterile corridors to ensure uninterrupted patient care. Exterior conduit routing required man lifts over the ambulance access driveway, managed in partnership with Flagger Force to maintain emergency flow.
Despite design changes and inspection delays, the team delivered safely, efficiently, and with zero impact to clinical operations — a testament to disciplined planning and exceptional field coordination.