09/04/2026
NEW CONSTRUCTION LOADING… 🔄🛠️
✅ Phase 1: Rough-in below slab
✅ Phase 2: Rough-in above slab — ALL COPPER 😮💨🔥
⏳ Phase 3: Trim-out… LOADING
From underground to inside the walls, this one has been a good one to watch come together. We’ve handled the plumbing from the ground up, and now we’re just waiting for our turn to come back and put the finishing touches on it.
That all-copper rough-in though… 👀👌
Some of the best work gets covered up before the house is ever finished — so we had to document this one.
Next stop: TRIM OUT. 🚿🚽✨
Martins Plumbing Group
📞 615-719-9810
New Construction • Remodels • Service