08/29/2026
3 TRACTORS. 3 ROUTES. Listed below. See which team you are on.
Where these routes go from here is up to you. The next contracts will help decide.
Team M6:
The M6 goes straight to the largest driveways with the most snow. This is Delta Terrace down to Williams Rd. She will then head down Elmer Hill Rd into Rome to help the twins clean up Rome.
This puts her in the N. Madison, N. George, Ridge Mills area. She will also run across Potter Rd as needed.
How she gets to Delta Terrace is still up in the air. It could be across Main St. in Lee Center and then over Cemetery Rd., going past two large developments. This has to be figured out soon, so do not drag your feet.
Team Chong:
The devil child is going down Brookfield Rd and out Sleepy Hollow Rd to 26, then down 26 into Rome. She will take over about 10 driveways the M6 currently does in that area, freeing the M6 to work farther north.
I do not believe Lorena Rd will come into play anymore. Too late. She will then go down 26 to Potter Rd and continue down to somewhere near Chestnut St and work that area.
Team Cheech:
Cheech is going down Thomas St to Jervis Ave. With our pricing, this should be the busiest route. Cheech will have her hands full and still go across Black River if needed.
Call 315-225-0156
Text 315-225-0156
Email [email protected]
Best is to visit the website for a quote https://coppercitylandscaping.com/snow-blowing/