08/27/2026
Check out FasTrac Hybrid Polymer Concrete in action on this bridge deck overlay in Springfield, Missouri!
Working alongside MoDOT and KCI Construction, FasTrac HPC was used to create a durable, impermeable overlay designed to protect the bridge deck while providing a smooth, long-lasting driving surface. And because HPC can return to traffic in as little as a few hours, crews can complete critical bridge repairs while minimizing disruption to drivers.