12/11/2012
Ray Cuomo and our Construction Division upgraded equipment and performed a turnkey Generator Swap on Kiawah Island, SC. Ray remove a 45 KW unit and replaced it with a 80KW Diesel system. The install consisted of removing all electrical hookups from the old system and replacing them with new components. The Automatic Transfer Switch was upgarded and replaced with a Kohler 400amp (ATS).