09/07/2026
Remember Friday's post β the white X's people thought were graffiti? Here's the crew turning them into an empty driveway.
Slab by slab, the loader lifts out what was marked and hauls it off. Then the shovels come out β the guys dig the sides down to clean grade so the forms set against something solid. Rushed grade work is why driveways crack early. Ours gets dug by hand for a reason.
Loader for the heavy lifting, hands for the part that has to be exact.
Forms next, then the pour.
Share it with somebody putting off a driveway, and hit follow if you're new.
Cracked or settling driveway? Call or text for a free quote.
π Follow Flatworx for the concrete most contractors won't explain.
Flatworx | 402-419-6583