08/30/2026
TB260 moved to the Wallingford job for the guys to keep plugging away! Water main and sewer line found to be extended to the building at new location, retaining wall exposed to be demolished for a new one to be rebuilt and relocate the main power that is under the existing retaining wall, new sidewalks and parking lot to come in the spring. Finished the day with a small shed pad for a friend with the help of Thomas Battiste excavation