AGA Engineered

AGA Engineered Architectural Glass & Aluminum

🇺🇸🇺🇸🇺🇸 Today, we pause to honor and remember those who have served.
05/25/2026

🇺🇸🇺🇸🇺🇸 Today, we pause to honor and remember those who have served.

05/07/2026

Safety is our number one priority, horizontal lifelines are one of the many measures we take to keep our glazing crew safe when installing curtain wall units.

05/05/2026

Training and continuing education on safety, equipment and operating procedures is at the core of our safety culture.

05/01/2026

Our design team partners with a third-party testing facility to ensure mock-up specimens meet project requirements and the National Fenestration Rating Council (NFRC) certification. This validation process helps us confidently submit energy performance ratings to our GC partners and keep projects on track.

04/29/2026

We take it all into consideration in the design assist phase, with input from our shop, field, estimating, design and PM team to deliver.

This Earth Day, we reaffirm our commitment to responsible design. Through our ongoing Embodied Carbon Project, we’re wor...
04/22/2026

This Earth Day, we reaffirm our commitment to responsible design. Through our ongoing Embodied Carbon Project, we’re working to better understand material impacts and reduce the carbon footprint of our façades.
Informed choices today contribute to a more sustainable tomorrow.
Learn more about our work here: https://loom.ly/MTmAY4s

Explore the crucial role of glass and glazing contractors in reducing embodied carbon in building projects. Learn how Life Cycle Assessment (LCA) and Environmental Product Declarations (EPD) inform sustainable design, and discover innovative strategies for selecting low-carbon materials, optimizing....

04/20/2026

Healthcare projects in California require a rigorous permitting process. Starting early and paying close attention to details is critical. Last-minute changes can cause significant delays in installation. With tighter schedules and interior work ahead, having everything aligned before field installation ensures a smooth ex*****on.

Project: Kaiser Roseville
GC: McCarthy Building Companies, Inc.
Architect: HOK

04/16/2026

Improving curtainwall unit thermal performance with low-e coatings.

Warm weather is here, don’t let heat illness slow you down!HydrateDress smartTake shade breaksLook out for symptoms like...
04/14/2026

Warm weather is here, don’t let heat illness slow you down!
Hydrate
Dress smart
Take shade breaks
Look out for symptoms like headache, nausea, cramps, or dizziness. Stay safe, stay cool!

04/08/2026

Consistent results require attention to detail, coordination and collaboration early on.

Looking back at a pivotal moment in our industry’s history, the National Conference of Glaziers and Glass Workers of the...
04/06/2026

Looking back at a pivotal moment in our industry’s history, the National Conference of Glaziers and Glass Workers of the United States and Canada. Collaboration and craftsmanship have always been at the heart of what we do.

Address

6400 Brisa Street
Livermore, CA
94550

Telephone

+15104446100

Alerts

Be the first to know and let us send you an email when AGA Engineered posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share