Man Maid

Man Maid Man Maid is a handyman service that provides skilled labor inside and outside your home.

Before Man Maid, after Man Maid, caulking addition.
04/08/2025

Before Man Maid, after Man Maid, caulking addition.

Got a drywall project? Be it matching texture and paint on a repair. Level 5 finish. Or small additions or renovations. ...
04/04/2025

Got a drywall project? Be it matching texture and paint on a repair. Level 5 finish. Or small additions or renovations. You got it made with Man Maid!

Day ten. Painted baseboards, replaced can lights with flat panel LED's, and added a transition.
02/01/2025

Day ten. Painted baseboards, replaced can lights with flat panel LED's, and added a transition.

Day nine: rubber flooring installed. Baseboards installed. Walls primed and painted. Just need to paint the baseboards, ...
01/29/2025

Day nine: rubber flooring installed. Baseboards installed. Walls primed and painted. Just need to paint the baseboards, figure out a transition between the rubber flooring and tile and install some new updated LED ceiling lights. I understand the rubber flooring is a little odd, but they don't make the existing tile, and the realtor believes that this was the best, most economical option. If the existing tile was available, we would have gone that route.

Day eight: Time to skim coat to get that level 5 finish. Also, raised the subfloor 1/2" to match elevation of the concre...
01/24/2025

Day eight: Time to skim coat to get that level 5 finish. Also, raised the subfloor 1/2" to match elevation of the concrete pad to the right. Now we're ready to sand and install rubber flooring.

01/24/2025

Check this out...

Day seven. Short day today. Just another layer of mud and finish outlet install.
01/23/2025

Day seven. Short day today. Just another layer of mud and finish outlet install.

Day six:  water lines moved. Subfloor installed. Drywall hung, taped and mudded. Electric outlet added to the East wall.
01/23/2025

Day six: water lines moved. Subfloor installed. Drywall hung, taped and mudded. Electric outlet added to the East wall.

Day five: trip to the dump. Trip to Resource to donate a few items. Subfloor is in. Well, half in. Deck is cut and ready...
01/17/2025

Day five: trip to the dump. Trip to Resource to donate a few items. Subfloor is in. Well, half in. Deck is cut and ready to go, as is the final floor joist, but can't put in until plumber comes on Monday. Nothing too exciting today, but you three have come this far, can't stop now!!🤣

Address

X### ###xx
Longmont, CO
80503

Alerts

Be the first to know and let us send you an email when Man Maid posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Man Maid:

Share