01/23/2026
Logistics and site coordination at our 18,000 sq. ft. hillside project in Los Feliz.
The current construction phase requires rigorous technical management of specialized trades and heavy equipment integration across four levels. We are moving top-down as the building transitions from the rough-in stage to the installation of fine interior finishes.