KAK Construction

KAK Construction My name is Kevin Krueckemeier, owner of KAK Construction, as a licensed General B Contractor serving California. I specialize in full rehabs and remodels.

You can view my portfolio at https://kakconstruction.com/portfolio/ Meet your Builder-

Hi, I’m Kevin! I was born and raised in Napa Valley, California. I began my career in construction when I was still in high school. I learned my craft from Napa Valley’s traditional European immigrant craftsmen from France, Germany, and Italy, who took immense pride in their trade. Their unique techniques and e

xacting expectations taught me to value the art of quality construction and craftsmanship. I am a California State Licensed General B contractor. Over the past 40 years, I have honed my skills in specialized trades and all phases of construction, such as electrical, plumbing, painting, drywall, etc. This leads me to effectively hire and supervise competent tradesmen to work alongside me as needed. My philosophy is that the process of building your home should be a rewarding experience facilitated by professional communication with your contractor and resulting in the timely and quality completion of your project. When I am not building or remodeling homes, I pursue my other passions which are to lead a healthy lifestyle, to enjoy the outdoors in backpacking, fly fishing, scuba diving, skiing, and travel abroad with Patricia, my amazing French life partner. I look forward to discussing your project with you. Cheers! Kevin Andrew Krueckemeier
General Contractor B
License # 697037

🏠 🏠 ADU in Santa Clara County --> do you need a separate water meter and new sewer line?Let me break down two terms you'...
08/18/2026

🏠 🏠 ADU in Santa Clara County --> do you need a separate water meter and new sewer line?

Let me break down two terms you're probably hearing a lot these days -- ADU and JADU.

An ADU is an Accessory Dwelling Unit. Fancy name for a second home on your property -- a backyard cottage, a converted garage, a unit over the garage.

A JADU is a Junior ADU -- same idea, but smaller and contained within the existing walls of your house. No more than 500 square feet, its own entrance, its own little kitchen.

Simple as that. A question I get when someone calls about building one or the other is some version of this:

"Do I need a separate water meter? Do I need to run a new sewer line all the way to the street?"

It's the right question to ask early -- because the answer affects your budget significantly, and it's different depending on what you're building and where. Here's how it actually works in Santa Clara County.

πŸ”΅ Water meter -- shared or separate?
For most ADUs and JADUs in Santa Clara County, a separate water meter is not required. The ADU connects to the existing water service line on the property -- tapped before the main house regulator, with its own secondary regulator installed before it enters the ADU. This keeps the ADU's water pressure independent from the primary residence.

However, if you want to meter the ADU separately -- which many landlords do for billing purposes -- you have two options.

The first is a separate utility water meter through your local water district. This gives each unit its own official account and bill. In Santa Clara County that runs $12,000 to $18,000 by the time you factor in the meter itself, the lateral work, and the utility connection fees

The second is a smart sub-meter -- a private metering device installed on the ADU's water line that tracks the unit's consumption independently and reports usage in real time through a mobile app. No separate utility account, no lateral work. The owner monitors water usage from their phone, catches leaks early, and can bill the tenant based on actual consumption if the lease specifies it. Installed cost is typically $500 to $1,500 -- a fraction of a full utility separation.

Neither is required. Which one makes sense depends on your long-term plans for the property and how you prefer to manage it.

JADUs -- which are contained entirely within the existing primary residence and cannot exceed 500 square feet -- can share a bathroom with the main house. No separate water meter is required and no new water service line is needed in most cases.

πŸ”΅ Sewer -- do I need a new line to the street?
This is where many people assume the worst. In most cases, you do not need to run a new sewer lateral from the ADU all the way to the main street connection.

For detached ADUs, the sewer connection must be placed downstream of the main house's building drain -- connecting to the existing main sewer lateral outside of the primary residence. In plain terms: you tap into the existing lateral that's already running from the house to the street, rather than running a whole new line.

For attached ADUs and JADUs, the connection is typically even simpler since the plumbing is already adjacent to the primary structure.

The exception: if the existing sewer lateral is too small, too old, or in poor condition to handle the added load, the building department may require an upgrade or replacement. In Palo Alto and Cupertino specifically, sewer lateral requirements can add $5,000 to $15,000 to a project budget. It's worth a camera inspection of the existing lateral before you finalize your ADU budget.

πŸ”΅ What about impact fees?
This is one of the most misunderstood costs in the ADU process. Here's the short version for Santa Clara County:

ADUs under 750 square feet: impact fees are waived entirely in most jurisdictions. This includes water and sewer connection fees in many cases.

ADUs 750 square feet and above: impact fees apply and are proportional to square footage. Depending on the city, these fees can run $10,000 to $30,000 on top of construction costs.

JADUs: sewer and water connection fees are waived in most Santa Clara County jurisdictions. JADUs are the most cost-effective path to adding a rentable unit to an existing single-family home.

πŸ”΅ The utility connection timeline -- what changed in 2026
One of the biggest frustrations in ADU projects has historically been waiting on PG&E and local utilities to process connection requests. Senate Bill 1196, introduced in February 2026, now sets strict deadlines for utility companies to provide service connections for ADUs and JADUs -- with penalties for delays. This is meaningful progress. When submitting a PG&E application for an ADU project, referencing SB 1196 timelines in your application helps establish accountability and can move the process faster.

πŸ”΅ The bottom line
For most ADUs in Santa Clara County you don't need a separate water meter and you don't need a new sewer line to the street. What you do need is a contractor who knows how to connect to existing infrastructure correctly, pull the right permits, and flag the exceptions before they become budget surprises.

Do you have an ADU or JADU project coming up?

Hope this helps,
Cheers,
Kevin

P.S. If the existing sewer lateral on the property hasn't been inspected in years, budget for a camera inspection before you start ADU planning.

🏠 California electrical panel and solar requirements in 2026 -- what to know before you build or remodelOne of the most ...
07/21/2026

🏠 California electrical panel and solar requirements in 2026 -- what to know before you build or remodel

One of the most common surprises I see on remodels and new builds right now isn't structural. It's electrical.

A client plans a kitchen remodel. Or a garage conversion. Or a new ADU. And somewhere in the process, they find out their panel can't handle what the project requires, including solar panels -- and that California now has requirements they didn't know existed.

I've done a lot of panel upgrades and solar-ready installs across Santa Clara County. Here's what's actually required right now, and what to factor in before you start.

πŸ”΅ New construction -- no longer optional

If you're pulling a permit for new residential construction in California -- single family home, townhouse, low-rise multifamily, or ADU -- solar is required by law. Has been since 2020. What changed as of January 1, 2026 is the updated Title 24 Energy Code, which adds battery energy storage to the mix.

🟑 Here's what's required under the 2026 code for new construction:

Solar PV system sized to offset the home's projected annual electrical usage. No exceptions unless the roof is heavily shaded, too small, or the home is seasonal.

Battery Energy Storage System (BESS) or at minimum battery-ready infrastructure -- conduit, wiring pathways, and panel capacity pre-installed for future battery installation.

EV charging capability. Every new residential unit must include pre-wiring for electric vehicle charging. It's not optional.

Electric-ready infrastructure for appliances -- space heating, water heating, cooking. If you're building new in unincorporated Santa Clara County, the county's reach codes go even further and require all-electric systems, not just electric-ready.

πŸ”΅ Remodels -- where it gets complicated

Existing homes built before 2020 are not required to install solar unless the remodel triggers compliance. What triggers it?

Adding conditioned square footage above a certain threshold.

Roof replacement -- if you're replacing the roof as part of a remodel, solar-ready requirements can kick in depending on scope and permit type.

Major renovations that touch HVAC, insulation, windows, or ducts trigger Title 24 compliance for those systems, which can have downstream effects on panel capacity requirements.

Bottom line on remodels: the scope of work determines what gets triggered. This is exactly the kind of conversation to have with your contractor before you finalize plans -- not after permits are pulled.

🟑 The panel conversation nobody has early enough

Most Bay Area homes built before 1990 have 100-amp panels. Some older ones have 60-amp. Neither is adequate for a home that now needs to support solar, a battery system, an EV charger, a heat pump, and modern appliances simultaneously.

A panel upgrade to 200-amp in Santa Clara County typically runs $3,500--$6,000 depending on the home and utility connection. Some homes need a new meter base as well, which adds time and coordination with PG&E.

The mistake I see most often: a client budgets for the remodel but not the panel. Then the panel issue surfaces mid-project, adds cost, and delays the inspection schedule.

Factor it in from the start. If the home is pre-1990 and the project involves any electrical work, assume the panel needs evaluation -- and budget accordingly.

πŸ”΅ Solar permits in Santa Clara County -- what to know

California has streamlined solar permitting significantly. Under AB 2188, residential solar systems up to 10kW go through an expedited process -- one inspection, standardized checklist, electronic submission. Permit fees are capped at $450 for systems up to 15kW.

That said, every city in Santa Clara County has its own AHJ (Authority Having Jurisdiction) and their own interpretation of what's required. San Jose, Santa Clara, Sunnyvale, and the county itself all have nuances. What sails through in one city can hit a snag in another.

If you have a project that involves solar, a panel upgrade, or new construction in Santa Clara County and want to understand what's required before you commit to a scope, call or text me.

If you manage rental properties or represent investors with older Bay Area homes, a panel evaluation is worth adding to your standard due diligence checklist. A 60 or 100-amp panel on a property you're planning to improve is a budget item waiting to surface.

Cheers,

Kevin

Click Here πŸ‘‡ to Discuss Your Project!
https://kakconstruction.com/lets-chat/

🏠 The Bay Area gas appliance ban -- what the deadlines mean for your propertiesI get asked about this more than almost a...
07/14/2026

🏠 The Bay Area gas appliance ban -- what the deadlines mean for your properties

I get asked about this more than almost anything else right now.

"Kevin, my water heater is on its last legs. Should I replace it with gas or go electric?"

A year ago that was a lifestyle question. Today it's a deadline question. Here's what's actually happening -- and what your clients, tenants, and properties need to do before the clock runs out.

πŸ”΅ What's been decided -- and when

The Bay Area Air Quality Management District adopted rules in March 2023 that ban the sale and installation of gas water heaters and gas furnaces across all nine Bay Area counties. That covers Santa Clara, Alameda, San Mateo, Contra Costa, Marin, San Francisco, Napa, Solano, and Sonoma.

πŸ”΅ Here are the hard dates:

January 1, 2026 -- already in effect. Sellers of residential property are now legally required to disclose the gas appliance ban to buyers and inform them of the potential electrical upgrades needed to comply. If you represent investors or manage properties that may sell in the next few years, this disclosure requirement is active right now.

January 1, 2027 -- six months away. Gas water heaters can no longer be sold or installed anywhere in the nine-county Bay Area. The BAAQMD board reaffirmed this deadline as recently as May 2026. No court has blocked it. It stands.

January 1, 2029 -- gas furnaces follow. After this date, when a gas furnace fails, it cannot be replaced with another gas furnace. It must be replaced with a zero-emission system -- typically a heat pump.

πŸ”΅ What this means on the ground

Here's the part most people aren't thinking about until it's too late.

After January 1, 2027, if a water heater fails and the home's electrical panel can't support a heat pump water heater, you could be waiting weeks -- or months -- for an electrician, a permit, and PG&E to process the upgrade before hot water is restored. That's not a hypothetical. Contractor availability and PG&E permitting backlogs are real constraints in Santa Clara County right now.

The window to avoid that scenario is 2026. This year.

πŸ”΅ What the electrical upgrade actually costs

Switching from gas to electric isn't just swapping an appliance. In older Bay Area homes it often means:

Panel upgrade to 200-amp: $3,500--$6,000 for above-ground wiring. Up to $50,000 if the utility transformer is underground or across the street.

New 240-volt circuit and wiring for heat pump water heater: $800--$2,500.

New 240-volt circuit for heat pump HVAC: $1,000--$3,000.

For a home built before 1980 doing a full gas-to-electric conversion, total electrical upgrade costs can exceed $100,000 in extreme cases. The older the home, the more it costs.

One exception worth knowing: newer 120-volt plug-in heat pump water heaters are now on the market. These connect to a standard household outlet without requiring a panel upgrade or new 240-volt circuit -- dramatically lowering the conversion cost for homes where space and clearance allow.

πŸ”΅ What about gas stoves?

No ban. California does not have a statewide ban on gas stoves, and BAAQMD's rules do not cover them. Existing gas stoves in homes can stay and can be replaced. The rules apply specifically to water heaters and furnaces.

πŸ”΅ What to do right now

If you manage rental properties: any unit with a water heater that is 8 or more years old should be evaluated now. Replacing it this year with a gas unit -- while still legal -- gives you maximum runway. A new gas tankless unit installed in 2026 can last 20 years, carrying the property well past the immediate transition pressure.

If you represent investors or buyers: the seller disclosure requirement is active. Gas appliances on a property being sold are now a line item in negotiations. Factor the potential electrical upgrade cost into your due diligence.

If you have a remodel or new construction project: panel capacity and appliance planning need to happen at the design stage, not at rough-in. I've been navigating these electrical requirements on projects across Santa Clara County and can tell you exactly what needs to happen and when.

The federal 25C tax credit that covered 30% of heat pump installation costs expired December 31, 2025. It is no longer available for 2026 installations. BayREN and Silicon Valley Clean Energy rebate programs still exist but funding is limited and changes frequently -- always verify current availability before planning a project around a rebate.

If you have questions about what any of this means for a specific property, let's chat. πŸ‘‡ I'll give you a straight answer.
https://kakconstruction.com/lets-chat/

Last Saturday was 4th of July, our 250-year anniversary as a free country. Growing up with grandparents and uncles who s...
07/08/2026

Last Saturday was 4th of July, our 250-year anniversary as a free country.

Growing up with grandparents and uncles who served in the Marines and Navy, the price of independence never went unnoticed in our house. BBQ and all β€” but always with moments of remembrance and gratitude for the freedom we defended.
With that, I'll keep this message short and get straight to something useful.

Last week, a client called me with a simple question: "Is now a good time to move forward on the remodel, or should I wait and see if costs come down?"
It's the right question to ask. And the best answer is: waiting may cost you more.

Here's what I'm seeing on the ground in the Bay Area right now.
What's going up, and why...

Construction input prices rose at a 12.6% annualized rate in just the first two months of 2026 β€” the sharpest jump since 2023.

Here's what's driving it by material:

πŸ”΄ Copper & Electrical β€”> Up significantly due to tariffs and tight supply. This hits kitchen and bath remodels directly: wiring, panels, outlets, fixtures. If your project involves any electrical upgrades, budget more than you would have a year ago.

πŸ”΄ Steel & Aluminum β€”> Tariffs on imported steel have pushed domestic prices 20–30% higher than in recent years. Affects structural work, framing hardware, and appliances with steel components.

🟠 Concrete & Cement β€”>Up 4–6% due to new EPA regulations tightening production. Relevant for foundation work, flatwork, and ADU slabs.

🟒 Lumber β€”> The one bright spot. Lumber has returned to pre-pandemic price ranges ($400–$500/mbf) and is relatively stable right now. If your project is wood-framing heavy, this works in your favor.

What this means for your project:

If you're a property manager planning unit renovations, a landlord considering a kitchen refresh, or an investor pricing out a flip β€” here's the practical takeaway:
1. Get your bids now. Material prices are moving faster than they have in years. A bid from 60 days ago may already be stale.
2. Prioritize electrical and copper-heavy scopes first. These are seeing the sharpest increases and the least predictability.
3. If lumber is a big part of your scope β€” move. This may be the best window you'll see for wood-framing costs in a while.
4. Build in a contingency. I'm advising all my clients to add at least 10–15% buffer on material estimates for any project starting in the next 90 days.

The bottom line:

After 40 years in construction across the Bay Area and out of state, I've seen a lot of market cycles. The contractors and property owners who fare best aren't the ones who time the market perfectly. They're the ones who make decisions based on real information and move with intention.
If you have a project on the horizon and want a straight-talking estimate based on what materials actually cost right now, I'm happy to do a free walkthrough and give you real numbers.
No obligation. No sales pitch. Just an honest assessment.

Cheers,

Kevin,
KAK Construction β€” General Contractor B, Lic #697037
Serving Santa Clara County & Silicon Valley
Kevin | KAK Construction

P.S.: Don't hesitate to forward this to any clients or partners who are sitting on a project decision. The information is the same regardless of project size.

P.P.S. Want to add me to your virtual Rolodex? Scan the QR code below - Create Contact - Reach out anytime

Little Silicon Valley remodel.
04/15/2026

Little Silicon Valley remodel.

04/15/2026

Posting a few delinquent pics of past projects...more to come :)

Posting a few delinquent pics of past projects...more to come :)
04/15/2026

Posting a few delinquent pics of past projects...more to come :)

Address

Los Gatos, CA
95124

Alerts

Be the first to know and let us send you an email when KAK Construction posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to KAK Construction:

Shortcuts

Featured

Share