09/02/2026
🏡 THE KINSLEE — PROGRESS UPDATE! 🔨
I personally put in some serious work today staining all the woodwork throughout The Kinslee, and I’m loving how it turned out! 🪵🔥
I made it a point to get all of the staining done BEFORE the final paint and fascia work. That way I could get after it without having to worry about stain getting on finished walls, ceilings, or fascia. Sometimes doing things in the right order saves a whole lot of headaches later! 💪
We’re moving right along:
* 🪵 Wood ceilings, beams, posts & accents stained
* 🔨 Trim work is going in
* 🛁 Tile is finishing up
* 🏠 Cabinets are installed
* 🚿 Vanities are in place
* 🎨 Paint & finish work coming up next
The stained wood against that dark brick and the white interior is really starting to bring the whole design together. The Kinslee is getting closer to the finish line every day!
A lot of work goes into the details people eventually see—and even more goes into doing things in the right order so the finished product turns out the way it should. Evergreen Construction LLC
You Dream It, We Build It. 🏡🔨