06/02/2026
A settling roadway. A failing subgrade. A bridge approach losing support.
See how HMI's Polyurethane Deep Foamjection™ was used to stabilize the ground below, restore support, and extend the life of the roadway without major excavation.
Check out our technical article for all the details⬇️
Stabilizing Roadway Subgrades and Bridge Approaches Using Deep Foamjection®: A Modern Approach to Infrastructure Resilience