Start to finish - This project was all about building a solid foundation. We handled everything from stripping the lot, excavating and pouring the footings, to forming and pouring the foundation walls, floors, and stoops. Once the concrete was complete, we backfilled the site and tied the driveway seamlessly into the garage and front stoop.
For this part of the job, we hauled an additional 1500 tons of sand, gravel, and fill; bringing the total of this entire project (starting with the driveway) to 3300 tons, to bring this project together!