Freeman Construction

Freeman Construction We specialize in concrete and masonry: Flatwork, Ornate Finishes, Stairs, Walls, Repairs, Demolition, Weather Proofing (sealing), etc.

We finished the paver patio today...first time using blue stone but it came out great!
06/13/2019

We finished the paver patio today...first time using blue stone but it came out great!

Starting on our new project... A paver patio. Some good old fashioned shovel and wheelbarrow digging today. Glad it was ...
05/28/2019

Starting on our new project... A paver patio. Some good old fashioned shovel and wheelbarrow digging today. Glad it was cool out!

Done! Concrete pad for cooler✅ handicap ramp✅ and we mixed and poured the sidewalk today!
05/21/2019

Done! Concrete pad for cooler✅ handicap ramp✅ and we mixed and poured the sidewalk today!

We’re also putting in a longer handicap ramp. We demolished the first one, set the forms, added crushed stone, and we’ll...
05/15/2019

We’re also putting in a longer handicap ramp. We demolished the first one, set the forms, added crushed stone, and we’ll pour it tomorrow.
Lastly we’ll add a walkway.

Putting in a concrete pad for a cooling unit behind Mikes Corner Store in North Andover. We dug it out, set the forms, a...
05/15/2019

Putting in a concrete pad for a cooling unit behind Mikes Corner Store in North Andover. We dug it out, set the forms, added some crushed stone, and we’re ready to pour the concrete tomorrow.

We made the forms, poured, and broom finished some dugout floors for the baseball fields in North Andover. We finished t...
04/30/2019

We made the forms, poured, and broom finished some dugout floors for the baseball fields in North Andover. We finished the first field. All that’s left on these ones are to cut some control joints and strip off the forms.

The season for masonry work is back in full swing! Yesterday we fixed stone stairs that somebody had started a few years...
04/12/2019

The season for masonry work is back in full swing! Yesterday we fixed stone stairs that somebody had started a few years ago and stopped midway through.
Here is a before and after.

Before and after... we added on to a pre existing concrete driveway and also put in another matching 18x18 concrete driv...
11/07/2018

Before and after... we added on to a pre existing concrete driveway and also put in another matching 18x18 concrete driveway in North Andover. Still have to remove forms and cut in control joints.

We poured and finished them last week and finally had a chance to strip the forms, yesterday. They came out nice!
11/06/2018

We poured and finished them last week and finally had a chance to strip the forms, yesterday. They came out nice!

Finished demolishing sidewalk. Moved all concrete to dumpster. We will put up forms and level it up tomorrow. Hopefully ...
10/22/2018

Finished demolishing sidewalk. Moved all concrete to dumpster. We will put up forms and level it up tomorrow. Hopefully pour and finish on Weds.

Doing a demolition of an existing sidewalk. Hopefully we will finish Friday or Monday and we will set up forms and pour/...
10/17/2018

Doing a demolition of an existing sidewalk. Hopefully we will finish Friday or Monday and we will set up forms and pour/cut new ones.

Floor poured, control joints cut in, forms removed, and it’s ready to go!
10/12/2018

Floor poured, control joints cut in, forms removed, and it’s ready to go!

Address

72 West Street
Methuen, MA
01844

Alerts

Be the first to know and let us send you an email when Freeman Construction posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Freeman Construction:

Share