10/25/2026
Waterfront custom home, Venetian Islands, Miami Beach: From the ground up, Ep. 3. The slab steel is set.
Oct. 16, 2026. Same promise as Ep. 1 and 2: this site, every month, until delivery.
The reinforcing steel is tied over the v***r barrier, ready for the slab pour. The white sleeves mark where plumbing will pass through the concrete. An orange cap covers every vertical bar along the wall.
Biscayne Bay is just past the wall, with Downtown Miami on the far shore. On an island lot, the flood zone fixes the floor height before the first bar goes in.
Next milestone: the pour. Own a lot on the islands, or about to buy one? DM us before you buy the lot.