09/28/2026
Just finished this project at SLCC’s Miller Campus.
Old tile and two inches of grout came out, epoxy fill went in, and a full terrazzo finish went over the top. All this was completed in 2 and a half weeks.
The terrazzo really brings the space together.
What’s the first thing you notice when you walk into a space like this?