Slabs poured in November behave differently than slabs poured in September.
Cold weather concreting is doable and we do it, but it costs schedule. Blankets, heat, longer protection windows, slower strength gain. All of it is manageable and none of it is free.
If your slab can land in Q4 rather than deep winter, now is when that decision is still yours to make. Our current mobilization window is two to three weeks.