10/21/2026
We pour from 20,000 square feet to over 100,000, and the range is the point rather than the top number.
A crew set up only for the very large jobs is inefficient on a 20,000 foot floor. A crew that mostly does small work is learning on the job when it gets a big one. The fleet and the crew size have to suit the slab in front of them.
Self-performing the large majority of the work is what makes that possible. We are not assembling a different set of subcontractors depending on the size of the pour.
Request a bid, (330) 231-3587 or yoderlaserconcrete.com