05/03/2026
Structure is fun, and often hidden, so let's talk about it while we can still see it! .
Steel beam went in, and runs from foundation where we grout the core solid first, add a capillary break, and run over to a PSL (paralam), which bears on a new footing.
This will picks up the floor framing so we can move the original bearing beam, cut out the the floor framing and bring in our new dancing winder staircase that we've been posting about.
Something we don't do that often is pour a dual thickness footing. In this case the engineer asked us to set the large L shaped footing 2" lower so we can attach our mounting plate and bolts, grout it in and tile over it. Essentially hiding the structural connection.
Fun stuff! ..