03/31/2026
๐ง Big Lift at Hornell High School! ๐๏ธ
Welliver is proud to provide construction management services for the Hornell High School Competition Gym Project. This Liebherr 500-ton Hydraulic Truck Crane is playing a crucial role in bringing this major campus transformation to life.
This two-story expansion delivers significant upgrades, including a new elevator, three stairwells, all new AHUs, terrazzo flooring, metal panel ceilings, a new weight room, girlsโ locker room, concession stand, referee shower rooms, wrestling room, updated corridors, new wall tile throughout, a new canopy, and new sidewalks. Outdoor improvements include a new turf field, goal posts, upgraded scoreboard and track timing technology, and a full track resurfacing.
Demolition efforts cleared the way by removing the main gym and its foundations, locker room areas, lobby spaces, gang bathrooms, fitness and wrestling rooms, part of the boysโ locker room, and a Musco light tower with foundation.
Proud to see this project risingโone lift at a time! ๐ช๐ฝ๐๏ธ
www.buildwelliver.com