03/19/2026
Eaton project - Beginning Stages 🔨
This is where precision starts and quality is built from the inside out. Every detail in the prep phase matters, and we’ve partnered with an amazing team to make sure this one is done right from day one.
Walls have been built out using foam shims to achieve perfectly plumb and flat surfaces — setting the foundation for a flawless install. We’ll be wrapping everything in KBRS board for a fully waterproof system.
A custom KBRS shower pan has been fabricated specifically for this space, ensuring a perfect fit and proper drainage. On the main floor, we’re installing Schluter DITRA underlayment to provide long-term durability and crack isolation.
This is the level of prep that separates standard from luxury.
Stay tuned as we take this Eaton project from start to finish 👀
Design by:
with.foam
SchluterDITRA TilePrep ConstructionLife BehindTheBuild LuxuryHomes CharlotteNC LakeNorman BathroomRemodel TileInstallation HighEndHomes CustomBuild TradePartners BuiltRight