The Witmer Group

The Witmer Group Building partnerships for enduring results since 1967. Restoration, waterproofing, concrete, masonry, and coating solutions across the Mid-Atlantic.

Since 1967, The Witmer Group has maintained a solid reputation as one of the premier
specialty contractors in Pennsylvania, Maryland and Delaware. We specialize in projects
with intricate masonry design, requiring superior craftsmanship, knowledge and skill. Our
team has the operational resources and bonding capacity to handle complex masonry
projects, restoration services, waterproofing, caulking

, air/vapor barriers, and coatings. We
have performed work for some of the nation’s top construction managers. Our experts
provide the highest customer service, quality and attention to detail.

August's Employee of the Month, Josh Shenfeld, has been with The Witmer Group for more than five years. Josh got his sta...
08/31/2026

August's Employee of the Month, Josh Shenfeld, has been with The Witmer Group for more than five years. Josh got his start in the construction industry through a family friend after growing up around concrete work with his dad.

For Josh, the best part of the job is the people he works with every day. He enjoys being part of a team where everyone works together and shares the workload, creating an environment where he genuinely enjoys coming to work.

A hands on learner, Josh has continued to grow by learning from the experienced people around him. Over the years, he's become more organized, taken on greater responsibility, and adapted to different crews and projects.

What motivates Josh each day is providing for his family. Outside of work, you'll usually find him boating, fishing, hunting, or spending time outdoors.

Josh's willingness to learn, team first attitude, and dedication to both his work and his family make him a well deserved choice for August's Employee of the Month.

There’s something special about wrapping up the week knowing your work will become part of history. 🧱🚂Pictured is mason ...
08/28/2026

There’s something special about wrapping up the week knowing your work will become part of history. 🧱🚂

Pictured is mason Tim Shirk laying brick at the Railroad Museum of Pennsylvania’s new roundhouse project, a future home for historic locomotives.

The work happening outside a community health center is never only about brick and mortar.At Union Community Care’s Oran...
08/25/2026

The work happening outside a community health center is never only about brick and mortar.

At Union Community Care’s Orange Street location, our restoration crew is addressing repairs at the top of the façade and the details that help protect the building from water intrusion.

While our team handles the exterior, Union Community Care can keep its focus on providing care and support to the people who walk through its doors.

That is what we provide to owners and facility teams: a crew that understands the issue, manages the work, protects the property, and helps keep the building ready for the work happening inside.

Strong teams are built through shared knowledge and hands-on experience. During this scaffolding training, Denny Comp, o...
08/21/2026

Strong teams are built through shared knowledge and hands-on experience.

During this scaffolding training, Denny Comp, our Training and Development Specialist, walked the class through proper assembly, inspection, and safe practices on the job site. By investing in practical training, we’re equipping our people with the confidence, skills, and safety mindset to do the job right.

7,500 square feet of flooring designed for an industrial environment.Our coatings team installed a ¼ inch urethane cemen...
08/17/2026

7,500 square feet of flooring designed for an industrial environment.

Our coatings team installed a ¼ inch urethane cement flooring system over a shot blasted substrate, followed by a full quartz broadcast and a 16 mil chemical resistant novolac epoxy topcoat.

The project also included:
• 400 LF of 4 inch radius cove base
• Keyed edges at drains, dock levelers, and door transitions
• Polyurea filled control joints
• Mock up installation before production for customer approval

Setting the stage for masonry restoration at Lancaster House North. 🏗️ Our crew is rigging the swing stage and preparing...
08/14/2026

Setting the stage for masonry restoration at Lancaster House North. 🏗️

Our crew is rigging the swing stage and preparing the site for Phase I of the project. With repairs spanning the building exterior, this setup gives the team the access needed to tackle the work safely and efficiently.
The scope includes joint and relief-angle restoration, corrosion treatment, new backer rod and sealant, flashing work, and localized brick repairs.

Next stop: the façade.

Have you ever seen a stadium built over a parking garage?🏈Now you have.The Witmer Group is proud to have played a key ro...
08/12/2026

Have you ever seen a stadium built over a parking garage?🏈

Now you have.

The Witmer Group is proud to have played a key role in protecting this elevated stadium with waterproofing systems, expansion joints, sealants, and specialty coatings that will help ensure the structure performs for years to come. While the turf is now in place, our team continues working through the final phases of the project.

08/11/2026

Trades 🤝 Trains

Railroad history was built by skilled trades, and today, another generation of tradespeople are contributing to that legacy.

Our crews are currently installing the complete masonry package at the Railroad Museum of Pennsylvania Roundhouse, including CMU, brick, flashing, cavity insulation, mortar, grout, lintels, reinforcement, and masonry accessories.

Two sides of the same wall.Before the masonry comes down, the shoring posts must go up.Temporary shoring post systems ma...
08/07/2026

Two sides of the same wall.

Before the masonry comes down, the shoring posts must go up.

Temporary shoring post systems maintain the structural integrity of the building by supporting the structure while the CMU and brick veneer are removed. The shoring remains in place until the rebuild is complete.

As work continues at Lincoln Park Elementary, crews are advancing multiple sections of the building at the same time. Ma...
08/05/2026

As work continues at Lincoln Park Elementary, crews are advancing multiple sections of the building at the same time. Material deliveries, forklifts, mast climbers, scaffolding, and layout all have to stay in sync so masonry installation can keep moving without slowing down.

Every wall is built around more than concrete masonry units.
• Door and window openings must be laid out precisely.
• Reinforced cells and bond beam courses are incorporated throughout the walls.
• Lintels, anchors, flashing, insulation, mortar, grout, and other masonry components are installed as each area progresses.
• Material staging has to keep pace with crews working dozens of feet above the ground.

With each lift of block, the school is becoming easier to recognize, and it's exciting to watch the project continue taking shape.

Address

1003 Cornerstone Drive
Mount Joy, PA
17552

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm

Telephone

+17176531428

Alerts

Be the first to know and let us send you an email when The Witmer Group posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to The Witmer Group:

Shortcuts

Share