Beard and Hammer

Beard and Hammer home improvement

Complete removal of the old kitchen and bathroom. Termite damage to the walls and floor joists. Started completely over ...
09/17/2025

Complete removal of the old kitchen and bathroom. Termite damage to the walls and floor joists. Started completely over and made the customer happy.

New flooring,paint and added new stairs to the basement.
09/17/2025

New flooring,paint and added new stairs to the basement.

Added 6 sinks, new outlets,new lights, and opened some walls up. Go check out Tawnya Thorp and salon 10.01 for your hair...
09/17/2025

Added 6 sinks, new outlets,new lights, and opened some walls up. Go check out Tawnya Thorp and salon 10.01 for your hair and nail needs.

Small bathroom new flooring, shower and paint.
09/17/2025

Small bathroom new flooring, shower and paint.

2 new floors for a commercial project. 12000sf of new flooring. 30 new offices. 9000sf of new ceiling grid.
09/17/2025

2 new floors for a commercial project. 12000sf of new flooring. 30 new offices. 9000sf of new ceiling grid.

Removed the drywall and installed shiplap for a small bathroom.
09/17/2025

Removed the drywall and installed shiplap for a small bathroom.

Removed the old carpet and installed 2200sf of flooring. New tile around the fireplace. Fixed a leaking windows. Replace...
09/17/2025

Removed the old carpet and installed 2200sf of flooring. New tile around the fireplace. Fixed a leaking windows. Replaced a fan.

New Master suite.
11/18/2024

New Master suite.

Removed some walls, framed in some new walls. All new flooring,doors,lights,ceiling tile,outlets,toilets,vanities,cabine...
08/21/2024

Removed some walls, framed in some new walls. All new flooring,doors,lights,ceiling tile,outlets,toilets,vanities,cabinets, countertops and paint.

Removed a wall, and plaster ceilings and plaster from the walls. Removed the subfloor and installed new. New joists to l...
08/21/2024

Removed a wall, and plaster ceilings and plaster from the walls. Removed the subfloor and installed new. New joists to level the floor. New joists in the ceiling to level the ceiling. All new electric,drywall,flooring,trim and paint. The ceiling had 4 cracked joist and was 5¼" out of level. The floor was 2½ out of level.

New island with cooktop and downdraft vent attached
08/20/2024

New island with cooktop and downdraft vent attached

Small bathroom job. New subfloor,flooring,toilet,vanity, and drain stack
08/20/2024

Small bathroom job. New subfloor,flooring,toilet,vanity, and drain stack

Address

Nashport, OH

Opening Hours

Monday 7am - 5pm
Tuesday 7am - 5pm
Wednesday 7am - 5pm
Thursday 7am - 5pm
Friday 7am - 5pm

Website

Alerts

Be the first to know and let us send you an email when Beard and Hammer posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Beard and Hammer:

Share

Category