03/26/2021
Here are some pictures of my current project. It’s a cabin for a church camp that meets in June every year north of Walnut Ms.
I was hired to do 8 showers and a large restroom area with 4 toilets with a lot of tile. It has been a great job so far and l am getting close to the end. I still have vanities to build along with bathroom stalls and a few other things. So stay tuned for the final posts. Hope everyone enjoys their Easter and I hope to see you soon.