CJ Fucci Construction inc.

CJ Fucci Construction inc. Contact information, map and directions, contact form, opening hours, services, ratings, photos, videos and announcements from CJ Fucci Construction inc., Contractor, 63 Russell Street, New Haven, CT.

https://www.enr.com/articles/62573-updated-no-easy-fix-for-potomac-river-sewage-spill-now-estimated-at-20mPotomac River ...
03/02/2026

https://www.enr.com/articles/62573-updated-no-easy-fix-for-potomac-river-sewage-spill-now-estimated-at-20m

Potomac River Sewer Interceptor recent collapse may turn out to me the worst in Americas history. Let hope our politicians will allocate mor funding for critical infrastructure as we are plauged with failures of major drinking water and sewer line failures

D.C. mayor’s declared disaster site gets additional federal help, while utility DC Water predicts repairs to finish in mid-March—but longer-term costs and impact concerns remain.

When you 17' in rock in City streets installing 24" sewer becomes like vitamins              One a day 💪
02/19/2026

When you 17' in rock in City streets installing 24" sewer becomes like vitamins One a day 💪

Norwalk CT.  Dispite ruff weather condtions we are moving forward at a steady pace. Installing a 24" PVC sewer directly ...
02/17/2026

Norwalk CT. Dispite ruff weather condtions we are moving forward at a steady pace. Installing a 24" PVC sewer directly next to the existing 15" clay pipe sewer. Some day are like brain surgery 17' deep ho-ramming out rock with out disturbance to the existing sewer then bury steel plates over trench box pave and open the road. All in a days work

https://newenglandconstruction.news/NEC/article/0232CF92-c-j-fucci-construction-continues-stormwater-sewage-separation-e...
02/04/2026

https://newenglandconstruction.news/NEC/article/0232CF92-c-j-fucci-construction-continues-stormwater-sewage-separation-effort-in-new-haven-connecticut
We are proud to our Trumbull St./Yale Campus Sewer Seperation Project the feature story February issue of New England Construction Magazine

The Greater New Haven Water Pollution Control Authority (GNHWPCA) began a combined sewer separation project 15 years ago that aimed to drastically improve four Connecticut communities’ stormwater management.

Beacon St sewer replacment begins  Replacing existinh 15" over capacity tile sewer with 24" SDR 26 average 17' deep 8" p...
12/17/2025

Beacon St sewer replacment begins Replacing existinh 15" over capacity tile sewer with 24" SDR 26 average 17' deep 8" pump by pass

Some intersections in New Haven Are As Congested With Utilites As Broadwy And 5Th Ave In New Your City. Work Continues O...
08/28/2025

Some intersections in New Haven Are As Congested With Utilites As Broadwy And 5Th Ave In New Your City. Work Continues On Trumbull St./Yale Campus Sewer Seperation. Installing A 12" Sewer And 18" Storm. Complex Support Of Excavation.A Mix of Solider Pile and Wood Lagging And Vertical Wood Sheeting.

We are honored to accept the 2025 Job of distinction from UCAC Utility Contractors Association of Connecticut  Thank You
03/31/2025

We are honored to accept the 2025 Job of distinction from UCAC Utility Contractors Association of Connecticut Thank You

Large pipe in tight spaces. New Haven Ct Orchard St sewer seperation GNHWPCA. Busy intersection in front of YALE St. Rap...
02/01/2025

Large pipe in tight spaces. New Haven Ct Orchard St sewer seperation GNHWPCA. Busy intersection in front of YALE St. Raphaels hospital. 54" RCP into a precast rectangular chamber. Project design was a 10' manhole. We discovered some differing condtions with regard to locations of a 30" sewer and ouher utilites. Last minute cooperative resign resulted in a recatngular chamber. Jon Gavin United Concrete pumped out shop drawings in hours, fabricated the chamber and had it on site in 5 days. Saved the day. CJ Fucci has great long time partners. GNWPCA, Cardinal Engineering, HERC/ American shoring. Quick Pick Crane Service. A parterning spirit gets thes best bang for the buck of taxpayer $$

01/03/2025
The Old School Way. Started the next phase of Trumbull St.Area/Yale Campus Area sewer separation New Haven CT, in conges...
10/29/2024

The Old School Way. Started the next phase of Trumbull St.Area/Yale Campus Area sewer separation New Haven CT, in congested streets full of utilites. The proposed 36" 30" 24" RCP storm drain lines must be inststalled in very tight corridors between existing utilites in busy streets with limited working hours. This installation requires support of excavation left in place to avoid damage and provide permanant support to the existing utilites. The project design specified a beam and lagging system with no vibration. After 50 +/- test pits we concluded the window for our pipe was tighter than anticpated and beam and lagging would not fit. "Back to The Drawing Board". Working close with our in house team and our partners American Shoring/HERC and Geoengineers we designed modular sheeting frames with slim 6" walls using 3" hardwood timber sheeting. The system was submitted as an alternative at no addtional cost to GNHWPCA. Mission accomplished. Moving right along.

The gradall  Great machine
10/25/2024

The gradall Great machine

Address

63 Russell Street
New Haven, CT
06513

Alerts

Be the first to know and let us send you an email when CJ Fucci Construction inc. posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to CJ Fucci Construction inc.:

Share

Category