08/16/2026
Ben’s AC completed a highly demanding HVAC replacement in the French Quarter.
The crew tackled a physically intense job on a small condo, using a lift/crane to carefully remove the old unit and hoist the new AC into place amid the Quarter’s tight streets and historic constraints. Despite the logistical challenges and physical strain, the team met the tight deadline and restored cooling on schedule.