04/16/2026
Customer came to us with a driveway riddled with potholes and getting washed away from water draining from up the hill.
We came in and ground the existing driveway and compacted it to start with a good base, raised the driveway up 6” with 80 tons of limestone base and capped it off with a nice coat of asphalt millings crowned out to shed water off the road.
We proceeded to cut a nice ditch next to the road to prevent any water from reaching the road. We used all the spoils onsite to fill in some low spots and grade the yard out
Call us to get you next project on the books!
936-697-9479