On Trac Construction Associates, Inc

On Trac Construction Associates, Inc On-Trac Construction was founded to provide hands-on personal attention to its client base.

The foundation for all of On-Trac Construction Associates, fit-out, renovation and restoration work is integrity, quality and reliability.

Project Update:OTCA is responsible for all temporary floor,wall and telecom equipment protection on the Aecom Tishman Ge...
07/03/2024

Project Update:

OTCA is responsible for all temporary floor,wall and telecom equipment protection on the Aecom Tishman Generator Replacement Project within the Astoria, Verizon Facility. Once temporary protection was completed, prep work included over 500 penetrations for new Nelson Studs, along with facilitation of proper expansion joints and rebar installation for newly poured 6” reinforced concrete slabs.

Additionally, OTCA was responsible for the new generator concrete platform which incorporated new steel framing, fabricated to support heavier structural loads. Upon completion of all new structural slabs, OTCA installed numerous 2-Hour Rated partitions and ceilings with associated doors, frames and hardware. While coordinating with Aecom & the various on-site trades, OTCA progresses in space prepping for one of Verizon’s largest Generator Replacements.

OTCA recently completed an interior office fit out for ADCO Electric at 355 Lexington Avenue. Scope included all new MEP...
01/23/2024

OTCA recently completed an interior office fit out for
ADCO Electric at 355 Lexington Avenue.

Scope included all new MEP, new ACT ceilings, glass office front partition system, and new lighting throughout the space! On-Trac worked diligently with all vendors to deliver this space within 15 weeks!

Wishing all the best to ADCO in their new office space for years to come!

OTCA HOLIDAY PARTY 2023!The OTCA team gathered together at the Tiro a Segno club to celebrate the holiday season! As we ...
12/23/2023

OTCA HOLIDAY PARTY 2023!

The OTCA team gathered together at the Tiro a Segno club to celebrate the holiday season! As we embark and gear up for the new year, we thank our team, all of our clients, and colleagues for coming out to celebrate!

Wishing everyone a Merry Christmas and a Happy New Year!

OTCA HOLIDAY PARTY 2023!The OTCA team gathered together at the Tiro a Segno club to celebrate the holiday season! As we ...
12/23/2023

OTCA HOLIDAY PARTY 2023!

The OTCA team gathered together at the Tiro a Segno club to celebrate the holiday season! As we embark and gear up for the new year, we thank our team, all of our clients, and colleagues for coming out to celebrate!

Wishing everyone a Merry Christmas and a Happy New Year!

OTCA recently completed a commercial office space for Curtis & Ginsberg Architects at 1 Battery Park Plaza owned by Rudi...
12/01/2023

OTCA recently completed a commercial office space for Curtis & Ginsberg Architects at 1 Battery Park Plaza owned by Rudin Management Co.
Scope items included layout planning, new ACT ceilings, all new MEP, custom pony walls, Tagwall glass office front system, custom millwork, & lighting design and controls. We are confident that this space will not only meet but exceed the expectations of the tenant providing them with a dynamic and inspiring workspace with amazing views for years to come!

On-Trac is pleased to showcase its installation of the 520 Fire Barrier System at 561 Greenwich St ! In their pursuit of...
10/31/2023

On-Trac is pleased to showcase its installation of the 520 Fire Barrier System at 561 Greenwich St ! In their pursuit of merging an existing masonry building with their new state of the art office tower, the design team was tasked with achieving both a seismic and fire rating that would allow multiple
openings between the two structures for use of the full city block footprint. On-Trac teamed up with INPRO to supply and install specialized fire barriers that would allow up to 7” of movement between the structures and still maintain their rating in a fire or seismic event. With addition of specialized aluminum expansion joint covers, future tenants will be able to fill the pans with their finished flooring of choice for a seamless integration to the adjacent space. On-Trac received recognition from the manufacturer for an innovative approach to bridging the
neighboring floor slabs and was invited to their preferred installers list!

On-Trac Construction was proud to be the General Contractor for the iconic “Big Button Sculpture” on 7th Avenue at 39th ...
02/21/2023

On-Trac Construction was proud to be the General Contractor for the iconic “Big Button Sculpture” on 7th Avenue at 39th Street. It was such an incredible experience working on this project and a major collaborative effort with UAP, Hines and other agencies. The new sculpture celebrates the Garment District’s rich history . Reaching a height of 28 feet, the new sculpture will create a dynamic experience for the many pedestrians walking along 7th Avenue for many years to come. Thank you to a great team


Photo Credits: Alexandre Ayer / Diversity Pics for the Garment Alliance

Wishing you and your families a Happy Holiday from all of us at On-Trac! 🎄
12/25/2022

Wishing you and your families a Happy Holiday from all of us at On-Trac! 🎄

 🇺🇸🦅
09/11/2022

🇺🇸🦅

Have a safe and Happy 4th of July!
07/04/2022

Have a safe and Happy 4th of July!

On-Trac proudly assisted in the installation of the new 1000 kW Diesel Generator System within the Verizon Laurelton Fac...
07/01/2022

On-Trac proudly assisted in the installation of the new 1000 kW Diesel Generator System within the Verizon Laurelton Facility. Our scope included the buildout of a new Generator Room consisting of new concrete pads, curbs and footings. Additionally included was a new courtyard staircase, installation of new acoustical wall panels, Fire Rated Partitions & Vestibules, FSD enclosures and Epoxy Flooring. We look forward to completing more projects with the Verizon & Tishman Aecom team!


Location: 140-10 183rd street New York, New York

Client: AECOM Tishman/Verizon

As we remember all those who have served for our freedom, have a safe and Happy Memorial Day! 🇺🇸
05/30/2022

As we remember all those who have served for our freedom, have a safe and Happy Memorial Day! 🇺🇸

Address

86-40 122nd St, Richmond Hill
New York, NY
11418

Telephone

+17184416717

Alerts

Be the first to know and let us send you an email when On Trac Construction Associates, Inc posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to On Trac Construction Associates, Inc:

Featured

Share

Category