10/23/2026
Burn marks and corrosion inside a meter socket can mean it's time for an upgrade.
On this Orlando project, we removed an aging, damaged 200 amp meter socket and replaced it with a new Siemens unit designed for both overhead and underground service. We installed a fresh meter mast with weather-resistant fittings, new entrance wires, and followed every NEC code requirement. Roof pe*******on was needed, so the customer will bring in a roofing contractor for patching.
With these updates, this property is now set up for safe, reliable power. Questions about your own meter socket? Reach out and we’ll walk you through what to look for.