08/05/2026
First up: framing, electrical, and plumbing—the home’s skeleton and nervous system. This stage includes a pre-insulation inspection to make sure everything is installed correctly before the walls are closed up. Thanks to the awesome teams at Alpine Ductless and Bazail Plumbing, we passed with flying colors. 👏
Next came insulation. Huge shoutout to Boulton Insulation for another clean, efficient job. David & Sonia have been intentional about using healthier, low-toxicity materials throughout their home, which is why we chose Rockwool insulation. Not only is it a great insulation product, but it’s also incredible for sound dampening.
Since music is such a big part of their lives, we insulated every interior wall—not just bathrooms and laundry rooms—to help create a quieter, more enjoyable living space. 🎶
The latest milestone is drywall, and D&G Drywall & Paint absolutely delivered. Their craftsmanship and efficiency never disappoint, and they make a difficult trade look effortless. After another smooth inspection, they’re already wrapping up the mudding stage (which means either they’re incredibly fast... or I took too long to post this 😅).
Next up: primer, texture, another coat of primer, and we’re getting even closer to the finish line!