08/22/2024
The last 72 hours have been packed with lots of miles and work. We traveled to Caldwell, Idaho to grout the annular space between a 96" host pipe and a 91" liner.
When we arrived (on our 1st anniversary 😅) we were a little shocked to find out it wasn't ready. The end seals had not even begun to be built. Rather than check into our Air BNB and relax for the day, we got to work providing direction and hands on labor to get the end seals built. We grouted the following day.
Oh, and it was 95 degrees with no shade. 😬