Woolsey Construction

Woolsey Construction Residential construction

On this project We removed the shower and tile replaced the rotten floor joist and installed new advantek subflooring .
03/12/2026

On this project We removed the shower and tile replaced the rotten floor joist and installed new advantek subflooring .

2026. Looking forward to a productive and busy year!!
03/06/2026

2026. Looking forward to a productive and busy year!!

We replaced some improperly built piers ,installed new beams and cleaned up this crawlspace.
02/16/2026

We replaced some improperly built piers ,installed new beams and cleaned up this crawlspace.

We are looking forward to another productive year..
06/17/2025

We are looking forward to another productive year..

On this home ,we had to lift the corner back up to its original position.  The corner had dropped 3 inches. The other co...
05/30/2025

On this home ,we had to lift the corner back up to its original position. The corner had dropped 3 inches. The other corner had to be lifted 1 inch. We installed beams and piers to support and lift the house. Nice view from this location.

Crawlspace clean out. New sill plates, beams and piers. And a moisture barrier on the ground.
04/19/2025

Crawlspace clean out. New sill plates, beams and piers. And a moisture barrier on the ground.

Our BBB certificate for 2025!!!
02/17/2025

Our BBB certificate for 2025!!!

Im a little behind on posting these. We will have 2025 BBB in a few weeks. And updated contractor license, when it's tim...
01/24/2025

Im a little behind on posting these. We will have 2025 BBB in a few weeks. And updated contractor license, when it's time to renew. We hope everyone has an awesome day!!!! And thanks too all of our customers and followers. We appreciate you!!!

We replaced termite damaged beams, joist, and subfloor. Also installed new concrete and block piers.
01/05/2025

We replaced termite damaged beams, joist, and subfloor. Also installed new concrete and block piers.

On this one we replaced those sill plates ,added new floor joist,  rim board,and repaired the rotten subflooring.
10/16/2024

On this one we replaced those sill plates ,added new floor joist, rim board,and repaired the rotten subflooring.

Here are some before and after pictures of the retaining wall we built this week .
08/17/2024

Here are some before and after pictures of the retaining wall we built this week .

Here we replaced the rotten I joist with LVL joist and lifted the house back up to its original position. The LVL joist ...
05/26/2024

Here we replaced the rotten I joist with LVL joist and lifted the house back up to its original position. The LVL joist are the exact same height dimensions as the I joist were when new, so everything goes back where it belongs.