Oasis Electric

Oasis Electric Electrical Contractor Residential, Commercial and Industrial - Electrical Contractor

Owner - Oregon Licensed Supervisor Electrician
Glen Lettenmaier

Finally got my final inspection (with no corrections) for "Grimm's Fuel Company's" new 480/277 volt, 2000 amp electrical...
08/13/2022

Finally got my final inspection (with no corrections) for "Grimm's Fuel Company's" new 480/277 volt, 2000 amp electrical service for the yard debris plant and associated areas.

SOLAR POWER IS A 100% CON JOB !!The clearest example is in Oregon, at Bonneville Dam is **Celilo** https://en.wikipedia....
11/10/2021

SOLAR POWER IS A 100% CON JOB !!

The clearest example is in Oregon, at Bonneville Dam is **Celilo** https://en.wikipedia.org/wiki/Celilo_Converter_Station part of the "Pacific DC Intertie" https://en.wikipedia.org/wiki/Pacific_DC_Intertie an existing electrical "supply to load" there's 3,800 MW [million watts or 3 Billion 800 Million watts / 3.8 GW] at **560,000 Volts DC (2-wire)** 24 hours a day, 7 days a week, 365 days a year (on demand power) supplying ONLY ⚡️1/2 of Los Angeles ENERGY⚡️

To replace this "High Voltage" DC Transmission Line with "SOLAR PANELS" .....
( average panel 340 Watts @ 24 Volts DC )

⚡️3,800 Mw @ 560,000 Volts DC, 3410 Amps⚡️

3,800,000,000 (3.8 Gw or 3,800 Mw) Watts / 340 Watts =
⚡️11,176,471⚡ Solar Panels @ 24 VDC = (One "Parallel" 3.8 Gw Solar Array)

560,000 Volts DC / 24 VDC = ⚡️23,334⚡ Total ("Series" 3.8 Gw Solar Arrays)⚡️

11,176,471 x 23,334 = ⚡️260,791,774,314⚡ **Total Solar Panels**

COST .... Solar Panels @ $50 each (Material, Labor & Land) for Solar Farm Arrays
261,000,000,000 x 50 = $13,050,000,000,000 ( Trillion ) Dollars

⭐261 BILLION⭐ Solar Panels are required, then where are you getting the 1/2 MILLION acres to make the Solar Farm for 1/2 a city with energy being made ....
💥ONLY when the SUN SHINES💥 ??

The Pacific DC Intertie (also called Path 65) is an electric power transmission line that transmits electricity from the Pacific Northwest to the Los Angeles area using high voltage direct current (HVDC). The line capacity is 3,100 megawatts, which is enough to serve two to three million Los Angeles...

Got the renewal of a "State of Oregon" CCB License .....
05/18/2021

Got the renewal of a "State of Oregon" CCB License .....

🤓 .... On Monday March 23, 2020, Oregon Governor Kate Brown issued Executive Order 20-12. The order did not include cons...
04/01/2020

🤓 .... On Monday March 23, 2020, Oregon Governor Kate Brown issued Executive Order 20-12. The order did not include construction among the business or industries required to close. "Oregon Construction Contractors Board sent this bulletin at 03/23/2020 01:56 PM PDT"

The new replacement 2000 Amp 480/277 Volt 3-phase "Yard Debris Recycling and Mulching Facility" at Grimm's Fuel Company ...
02/22/2020

The new replacement 2000 Amp 480/277 Volt 3-phase "Yard Debris Recycling and Mulching Facility" at Grimm's Fuel Company was turned on February 17,2020 and is presently running at 80% capacity until the last circuits are connected. There is also an addition to the service with two (2) 300amp 480volt 3-phase circuits for two state of the art 8-Zone **ASP** composting floors coming on line.

Great day at Grimm's Fuel Company getting the electrical construction approval from Washington County to have the new 20...
01/22/2020

Great day at Grimm's Fuel Company getting the electrical construction approval from Washington County to have the new 2000 Amp 480/277 Volt 3-Phase replacement service connected by Portland General Electric. So now we can reconnect equipment electric feeders to get the plant up and running again.

Here is the first 480 Volt 1000 Amp feeder installed to the 600 Hp motor starter one of the two (2) for the *Hammer Mill...
01/19/2020

Here is the first 480 Volt 1000 Amp feeder installed to the 600 Hp motor starter one of the two (2) for the *Hammer Mill* grinder used in the composting of yard derbies .... the wire size is 500 MCM copper.

The new building Oasis designed is almost complete, electrical components in place and the lighting and heater is runnin...
01/19/2020

The new building Oasis designed is almost complete, electrical components in place and the lighting and heater is running off an installed generator back-up panel connected temporarily to a 120/240 Volt 2,480 Watt portable generator for construction.

The new 2000 Amp 480/277 Volt replacement electrical service equipment and *Hammer Mill Grinder* two RVSS (reduced volta...
01/02/2020

The new 2000 Amp 480/277 Volt replacement electrical service equipment and *Hammer Mill Grinder* two RVSS (reduced voltage solid state) rock crusher motor starters at Grimm's Fuel Company "compost recycling plant" is finally in place and ready for starting the re-connection wiring.

09/14/2019
We received the approval from Portland General Electric (PGE) and now a Electrical Permit from Washington County for the...
09/02/2019

We received the approval from Portland General Electric (PGE) and now a Electrical Permit from Washington County for the *NEW* 2000amp 480/277volt Electrical Service and connections of the existing equipment so we can get started on the replacement.

This is the Utilities (PGE) 2000 amp 480/277v incoming section area of the service from the 1,500Kva utility transformer...
07/11/2019

This is the Utilities (PGE) 2000 amp 480/277v incoming section area of the service from the 1,500Kva utility transformer to the two (2) 1,600 amp distribution sections (not shown). The explosion not only destroyed the service busing but burnt the incoming wires and PVC window conduit tops that goes to the transformer. The metering C.T.'s have melted also is shown.

Address

Oregon City, OR
97045

Alerts

Be the first to know and let us send you an email when Oasis Electric posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Business

Send a message to Oasis Electric:

Share

Category